London Bridge

Merson-ASG were appointed by Costain to work with them in delivering the construction design, manufacture and installation of signage at the London Bridge Station redevelopment project.

Design intent and wayfinding planning has been completed by Maynard Design and Grimshaws and Merson-ASG are now working with both and Costain to progress the project on site.

The typical complexities of installing in a rail environment are present - for example night shifts, working at height, working next to the platform edge etc. Each needs considered and detailed work package plans and task briefings are written and communicated to our installation teams.

Signage has been completed on several platforms and includes architectural stainless steel work as part of the platform numbers as well as more traditional signage works.

Suspended customer information screens combined with platform numbers are spaced out on each platform. Each platform number required it's own design due to the wave canopy from which they are all suspended, therefore no two structures are the same and each needs its own design development.

The materials specified result in a high quality product which will last London Bridge for many years into the future.

Services provided

    • Technical Design
    • Prototyping
    • Manufacture
    • Installation
    • Programme Management